歡迎您訪問北京中水新華國際工程咨詢有限公司官方網(wǎng)站!
云南龍江水利樞紐工程


      龍江水電站位于云南省德宏傣族景頗族自治州潞西縣境內(nèi)的龍江干流上,是以發(fā)電、防洪為主,兼顧灌溉的綜合性樞紐工程??傃b機24萬kW,設(shè)計年發(fā)均電量10.25億kW·h,總庫容12.17億m3,2010年11月全部機組投產(chǎn)發(fā)電。工程的建設(shè)投運對促進當(dāng)?shù)亟?jīng)濟社會的發(fā)展、改善生態(tài)環(huán)境將發(fā)揮重要作用。我們對水利樞紐的前期選址、規(guī)劃、可行性研究、施工組織設(shè)計方案、水庫調(diào)度運用方案等進行了技術(shù)咨詢并提出科學(xué)的解決方案。


      Longjiang Hydropower Station is located in the Dehong Dai Jingpo Autonomous Prefecture in Yunnan Province, Luxi County in the mainstream of the Longjiang River, is a power generation, flood control, taking into account the integrated irrigation hub project. With a total installed capacity of 240MW, the designed average annual generating capacity is 1.025 billion kW · h and the total storage capacity is 1.217 billion m3. In November 2010, all generating units were put into operation. Construction and operation of the project will play an important role in promoting the development of local economy and society and improving the ecological environment. We conducted a technical study on the site selection, planning and feasibility study of the water conservancy project, the consultation on the design proposal of the construction organization, and the discussion on the application of reservoir operation and proposed a scientific solution.